WT-CloudsandCholla

News - Details

LAKE PLEASANT: Pipeline Canyon Trail Bridge Temporarily Closed

 

Due to fluctuating water levels, the Pipeline Canyon Bridge on the Pipeline Canyon Trail is temporarily inaccessible.  We anticipate the water will be high enough sometime in early December for the bridge to be re-installed when water levels are sufficient.  Lake Pleasant is a water reservoir, and regularly fluctuates around 60-70 ft on average in water elevation each year (highest level in Spring, lowest level in Fall/Winter).

Back to news
 
Web site design and development by Americaneagle.com
Close